Costa del Sol's future takes shape: new plan proposes railway extension to Estepona, road improvements and controlled development


The Andalusian Regional Government has approved a new Territorial Planning Scheme for the Western Costa del Sol, covering nine municipalities in Málaga province. The document proposes extending the Cercanías commuter railway beyond Fuengirola, creating six new connections to the AP-7 motorway, improving water infrastructure and protecting natural areas. It also establishes guidelines for future ho

Costa del Sol's future takes shape: new plan proposes railway extension to Estepona, road improvements and controlled development
Estepona -
26 November 2026
Estepona
Breaking News

The Western Costa del Sol now has a new roadmap for its future development. The Andalusian Regional Government has approved a territorial planning scheme that sets out how urban growth, transport infrastructure, public services and environmental protection should be coordinated across one of Málaga province's most economically active and popular tourist areas.

On Wednesday 25 November 2026, the regional government's Council of Ministers approved the new Territorial Planning Scheme for the Western Costa del Sol (POT), restoring a shared planning framework for nine municipalities.

The plan covers Fuengirola, Mijas, Marbella, Estepona, Casares, Manilva, Ojén, Istán and Benahavís, which face common challenges involving population growth, transport, housing affordability and the availability of essential resources.

Among its most significant proposals is a long-discussed infrastructure project: extending the Cercanías commuter railway beyond Fuengirola to serve Marbella, Estepona and other communities along the western coastline.

However, the document addresses much more than railway transport. It also proposes adapting the A-7 to improve public transport, studying new access points to the AP-7 motorway, strengthening water supplies and restricting urban development in environmentally sensitive areas.

The approval represents an important administrative step, although it does not mean that every infrastructure project included in the plan will begin immediately.

Which Málaga municipalities are included in the new territorial plan?

The Territorial Planning Scheme covers nine municipalities in the Western Costa del Sol, stretching from Fuengirola to Manilva and including several inland towns.

These communities form a closely connected area where thousands of residents travel between municipalities every day for work, education, shopping and public services.

The municipalities included are:

MunicipalityMain issues addressed by the plan
FuengirolaRailway connections towards the west and regional mobility
MijasAP-7 access points, public facilities and urban growth
MarbellaPublic transport, green spaces, water and infrastructure
EsteponaFuture railway connections and territorial planning
CasaresNew road access and environmental protection
ManilvaIntegration into the wider western coastal planning strategy
OjénTransport connections and preservation of natural surroundings
IstánMotorway access and landscape protection
BenahavísImproved connections and coordinated urban development

The aim is to prevent individual municipalities from planning major infrastructure independently when its operation also affects neighbouring communities.

For example, Marbella's transport needs cannot be considered solely within its municipal boundaries, because many daily journeys connect the town with Mijas, Fuengirola, Benahavís and Estepona.

The same applies to water supply networks, roads and natural areas extending across several municipal territories.

The coastal railway returns as one of the Western Costa del Sol's main priorities

The possibility of extending the railway is one of the most significant elements of the new plan.

At present, Málaga's C1 Cercanías commuter line terminates in Fuengirola, leaving other major population centres along the western coastline without a direct railway connection.

The POT proposes extending rail services beyond Fuengirola to serve municipalities further west along the coast.

The proposal would address one of the area's most persistent transport challenges: its heavy reliance on private vehicles and road travel.

Despite its population, economic importance and tourism industry, Marbella still has no passenger railway connection.

Estepona is also outside the current Cercanías network.

The new territorial plan identifies rail transport as a strategic infrastructure priority for improving connections between these municipalities and the wider Málaga metropolitan area.

Does this mean the Cercanías railway to Estepona will definitely be built?

No. Approval of the POT does not amount to authorisation for railway construction.

The document establishes a territorial planning proposal and formally recognises the need to improve transport connections across the Western Costa del Sol.

However, building a new railway requires technical studies, route assessments, environmental evaluations, detailed engineering projects, funding and agreements between the relevant authorities.

Spain's Ministry of Transport is an essential participant in the development of state railway infrastructure.

Consequently, including the railway extension in the POT does not establish a construction start date or an opening date.

It also does not confirm the final route, station locations or total cost of the project.

What the approval does mean is that the need for a railway extension has now been incorporated into the officially approved territorial planning framework for the area.

The plan also proposes connections to the Mediterranean Corridor and high-speed railway network

The railway strategy extends beyond improving local commuter journeys.

The document also calls for better integration between the Western Costa del Sol, the Mediterranean Corridor and Spain's high-speed railway network.

This ambition aims to strengthen connections for an area with significant tourism, residential and economic links to other parts of Spain.

The broader objective is to make journeys more efficient while providing alternatives to road transport.

However, these connections will also require agreements with the Spanish Government and separate infrastructure planning.

Approval of the POT provides a strategic framework rather than an approved construction project.

The A-7 could be adapted to give public transport dedicated space

Another major proposal focuses on the A-7, one of the most important roads for daily travel along the Costa del Sol.

The new plan proposes transforming it into a transport corridor with dedicated space reserved for public transport.

The measure aims to improve the reliability of public transport in an area where road congestion affects several sections of the network.

Providing dedicated space for buses or other collective transport services could improve journey times and service consistency between municipalities.

However, the document does not yet authorise a specific dedicated transport corridor along any particular section of the road.

Implementation will depend on the necessary studies, infrastructure projects and agreements between the relevant administrations.

The strategy also includes improvements to regional and provincial roads to strengthen connections between different urban areas.

Six new AP-7 motorway junctions to improve access

The POT identifies a need to improve access to the AP-7 motorway.

To address this, it proposes six new junctions at different locations across the area.

The proposed locations are:

AreaMunicipality or location
CasaresCasares
BenahavísBenahavís
IstánIstán
Hospital Costa del SolMarbella
La Cala de MijasMijas
Las LagunasMijas

The aim is to make the motorway easier to reach from communities that currently depend on limited road connections or indirect routes.

New junctions could help redistribute traffic and improve access between the main roads serving the Western Costa del Sol.

However, these six junctions are proposals included in the territorial plan and should not be interpreted as construction projects that have already been tendered or given confirmed completion dates.

Their implementation will require the involvement of the relevant authorities and the appropriate technical procedures.

The plan renews calls to remove AP-7 tolls

The document also addresses another long-standing transport issue: removing tolls from the AP-7, at least for local residents.

The purpose of this proposal is to make the motorway a more accessible alternative for everyday journeys.

Such a measure could change how traffic is distributed between the main coastal roads.

However, eliminating or reducing motorway tolls requires separate decisions by the competent authorities and agreements concerning the management of the infrastructure.

Approval of the POT does not mean that the AP-7 will immediately become toll-free.

The plan includes this ambition among its transport objectives, but it does not itself change the motorway's existing charges.

More cycle routes, pedestrian paths and connections between municipalities

The transport proposals also cover walking and cycling.

The plan aims to complete a network of cycle routes and pedestrian connections linking urban areas and natural spaces.

This includes the Senda Litoral coastal path and sections of the Gran Senda de Málaga long-distance walking route.

The intention is to improve the continuity of these routes and strengthen alternatives for both leisure and everyday journeys.

Better pedestrian and cycling connections could also improve access to public spaces and tourist attractions.

These developments will need to be coordinated with existing infrastructure and individual municipal planning.

Five major parks to protect the Costa del Sol's landscape

Urban development in the Western Costa del Sol takes place alongside areas of considerable environmental value.

The new plan establishes a protection strategy designed to connect natural spaces, rural coastal land and river corridors.

Its aim is to maintain ecological and scenic continuity, preventing future developments from fragmenting environmentally sensitive areas.

As part of this strategy, the POT proposes a network of five parks serving several municipalities.

Two would be newly created and located in Marbella:

  • Guadaiza, around the river and its surrounding corridor.
  • Elviria, in the eastern part of Marbella.

The proposal aims to increase the availability of open spaces and protect important natural areas through planning that extends beyond individual municipal boundaries.

These proposed parks should not be confused with facilities that have already been built and opened to the public.

Their development will require the appropriate planning and management procedures.

Flood protection and restrictions on urban development

Managing flood risk is an important part of the territorial planning scheme.

The document incorporates flood-prone areas identified in existing sector-specific planning and establishes criteria for their protection.

It also considers rivers and watercourses, which play important environmental and drainage roles.

The strategy aims to prevent future urban developments from occupying land where construction could damage natural features or increase exposure to certain risks.

The POT also excludes areas of particular natural and landscape value from urban development.

This means that future construction must respect the restrictions established for these sites.

The overall objective is to balance the area's development needs with the conservation of its landscapes and natural resources.

Thirteen priority areas for better services and public facilities

The POT identifies 13 priority development areas, many of them located near the A-7.

The planning framework aims to improve the organisation of certain urban areas and facilitate the provision of public services and facilities.

Among the locations identified for facilities serving more than one municipality are:

  • La Torrecilla, in Marbella.
  • Las Lagunas, in Mijas.

The aim is to create facilities capable of meeting the needs of residents from several municipalities.

This approach seeks to reduce inequalities in access to services and improve the geographical distribution of public infrastructure.

Identifying these areas does not mean that every building or facility has already been designed.

Individual projects will need to be developed through the relevant planning procedures.

What changes for housing development on the Costa del Sol?

Housing is another major issue addressed by the plan.

The Western Costa del Sol faces significant residential pressures linked to population growth and economic activity.

The POT establishes that future housing developments should pay particular attention to the primary housing needs of local residents.

It also calls for greater provision of protected housing for households with fewer financial resources.

This approach aims to ensure that residential planning responds not only to property market demand but also to the needs of people who live and work in the area.

Municipalities will need to incorporate these criteria into their urban planning instruments in accordance with the applicable legal framework.

However, the plan does not announce a specific number of new affordable homes or guarantee that construction will begin immediately.

Its purpose is to establish objectives and conditions to guide future residential development.

Water supply is another priority: Marbella desalination plant and connection with Málaga

Water availability is one of the Costa del Sol's main challenges, particularly during periods of drought and increasing demand.

For this reason, the new POT identifies several water infrastructure measures as priorities.

One is the improvement of Marbella's desalination plant, a strategic facility for supplying the western coastal area.

The plan also proposes a reversible connection between the water supply systems of Málaga city and the Western Costa del Sol.

The ability to transfer water in both directions could provide greater flexibility during periods of varying water availability.

Additional proposals include:

  • Renewing water distribution networks to reduce losses.
  • Encouraging the reuse of treated wastewater.
  • Improving the planning of sewerage and wastewater infrastructure.
  • Coordinating water availability with future urban growth.

These measures aim to strengthen the security of water supplies, although each project will require its own approvals, funding and implementation.

Energy, wastewater and waste management

The territorial plan also establishes criteria for other essential infrastructure.

These include energy supply networks, wastewater systems and waste management facilities.

Planning must consider the requirements of both existing urban areas and future developments.

This approach aims to prevent communities from expanding without the necessary services being planned in advance.

Coordination between municipalities is particularly important for infrastructure that serves more than one town.

Why did the Western Costa del Sol need a new territorial plan?

The approval restores a shared planning framework that had been lost following the judicial annulment of the previous document.

The original Territorial Planning Scheme for the Western Costa del Sol was approved in 2006 but was subsequently annulled by Spain's Supreme Court.

The new version has been developed under the relevant planning and assessment procedures and adapted to Andalusia's Law for the Promotion of Territorial Sustainability, known as LISTA.

The approval aims to provide the nine municipalities with a common framework for major territorial decisions.

This is particularly important in an area where transport networks, water infrastructure and natural spaces are closely interconnected.

The intention is for urban growth and infrastructure development to follow shared principles rather than relying exclusively on independent municipal decisions.

Who will monitor the implementation of the new plan?

The decree provides for the creation of a Monitoring Commission for the Western Costa del Sol Territorial Planning Scheme.

The commission will be attached to the Andalusian Regional Government department responsible for housing, youth and territorial planning.

It will include representatives from:

  • The Andalusian Regional Government.
  • The Spanish Government.
  • Málaga Provincial Council.
  • The councils of all nine municipalities included in the plan.

The commission will review the instruments used to develop the plan, issue reports on updates and examine management assessments.

It will also be able to propose amendments or a wider review of the document when necessary.

In addition, the regional government must prepare a monitoring report every three years to evaluate progress in implementing the POT.

When will the new Territorial Planning Scheme come into force?

Although the Council of Government approved the decree on 25 November 2026, its entry into force depends on official publication.

According to the announcement from the Andalusian Regional Government, the plan will come into force the day after its publication in the Official Gazette of the Andalusian Regional Government (BOJA).

From that point, its rules will become directly applicable and will take precedence over incompatible provisions in lower-level urban and territorial planning instruments.

Affected planning documents will have four years to adapt to the new framework.

This does not mean municipalities must complete all the proposed infrastructure projects within four years.

The deadline concerns the adaptation of planning instruments, while construction projects will depend on their individual approval and implementation processes.

What does the plan actually mean for Costa del Sol residents?

For residents of Fuengirola, Mijas, Marbella, Estepona and the other municipalities covered, the new POT establishes objectives that could influence the area's development over the coming years.

The proposed railway extension aims to provide an alternative to travelling by car, while the new AP-7 junctions and A-7 improvements seek to make road journeys easier.

The planning of public facilities and housing is intended to align urban development with the needs of local residents.

Meanwhile, the environmental and water infrastructure measures aim to protect natural resources and strengthen essential services.

However, it is important to distinguish between objectives and completed projects.

The POT provides a framework for planning and coordination, but many of its proposals still require individual projects and agreements between administrations.

The Costa del Sol looks to the future with the coastal railway among its main ambitions

The approval of the Western Costa del Sol Territorial Planning Scheme marks another step towards coordinating development across nine municipalities in Málaga province.

The document restores joint planning in an area facing significant challenges involving transport, housing, water supplies and environmental conservation.

Among its most notable proposals are extending the Cercanías railway westwards from Fuengirola, creating six new AP-7 access points, reserving space for public transport along the A-7 and protecting natural corridors.

It also proposes improvements to water infrastructure, the creation of new parks and better planning of housing and public facilities.

The next major challenge will be turning these territorial proposals into specific projects, supported by funding, administrative agreements and realistic construction schedules.

For residents of the Western Costa del Sol, approval of the POT does not mean that trains will immediately reach Marbella or Estepona. However, it does establish a new planning framework for some of the area's most urgently requested infrastructure improvements

Similar News

Contact us